BlastIQ™ Underground Desktop - Move rings between blasts

Application:

BlastIQ™ Underground Desktop

Version:

1.4.1 - 1.4.2

KBA Summary:

This KBA will explain how users can move rings between plans in BlastIQ™ Underground using BlastIQ™ Underground Desktop.

Information

If you are using BlastIQ™ Underground Desktop v1.4.4 or greater, please refer to this article.

Introduction

Users can move rings between two existing BlastIQ™ plans or move rings from an existing BlastIQ™ plan to a new plan.

Functionality
Configuration Duplicate Ring IDs
  1. Rings can only be moved between plans on the same BlastIQ™ site.
  2. The loading design, measurements, comments or actuals for any holes contained within a moved ring will be moved to the destination plan.
Move Rings

To move rings between plans in BlastIQ™ Underground Desktop:

  1. Ensure that the source plan exists in BlastIQ™ and has been loaded in the BlastIQ™ Underground Desktop. 
  2. Navigate to the Tools tab on the Ribbon and select the Move Rings button.
  3. If you have more than one plan loaded into the application, you will asked to select a plan. Select a plan using a checkbox, then select Next.
  4. The source plan must be synced with BlastIQ™ before completing the Move Rings operation. This is to ensure that all holes and comments exist in BlastIQ™ prior to the move. Select Yes to sync with BlastIQ™ and proceed to the next step.
  5. To select rings from the source plan:
    1. You can use the search bar to dynamically filter rings by ring name for easier selection.
    2. Select a ring by using the check box next to the ring name.
    3. Optional: Once selected, a ring can be renamed.
  6. Next, select the type of destination plan: a new plan or an existing plan.
Move rings to a new planMove rings to an existing plan

If you are moving rings to a new plan:

  1. Ensure the "Create new plan" checkbox is selected,
  2. Provide a name for the new plan. Note: you will not be able to proceed until a unique plan name has been entered.
  3. Optional: apply a plan group label to the new plan. Refer to this article for more information about grouping blasts.
  4. Select Move Rings to start the operation.
  1. You will see a screen that shows the progress of the Move Rings operation. If there are any errors during the operation they will be displayed here. You will be provided with the option to Retry, or Go Back to the previous screen and change your specifications as shown in the example below which shows an error due to duplicate ring IDs.
  2. A successful Move Rings operation will show the successful steps, and provide you with the option to start a new move rings operation via the Start Over button or exit the wizard via the Finish button.
  3. Once you have exited the wizard, the main window will show the destination plan, and hide the source plan. Use the eye icons in the project manager to toggle plan visibility.

     
Was this article helpful?
0 out of 0 found this helpful