2.20.11 SHOTPlus™ Tunnel Beta Release Notes

2.20.11

SHOTPlus™

Tunnel 

Beta

November, 2022

Version 2.20.11 of SHOTPlus™ Tunnel Beta, first offered to users on Monday 12th December 2022
A notification will appear on start-up in SHOTPlus™ Tunnel Beta once the update is available.
For further information on updating the SHOTPlus™, please contact the BlastIQ™ Support Team via support.blastiq.com.

  New

  1. BlastIQ™ Licencing has now been enabled in SHOTPlus™ Tunnel1.

  Information

    1. To find out more about BlastIQ™ Licencing in SHOTPlus™ Tunnel, click here.

  Improved

  1. Changed export preferences when exporting MDCU Charge files.

  Fixed

  1. An unhandled exception was occurring in SHOTPlus™ Tunnel when printing a plan.
  2. Entering angles >45° was causing SHOTPlus™ Tunnel to crash.
  3. 'Retain Timing' functionality was not working correcting in the Loading Tool.
  4. Opening Blast Settings was incorrectly clearing the EBS tie-in due to incorrect EBS blaster settings.
  5. MSW executable was not being included in the SHOTPlus™ Tunnel installation packaged.
  6. Blast Location in blast reports did not match the location of the blast in the blast header.
  7. Initiation times for WebGen™ blasts were being rounded incorrectly.

  Information

    1. The MSW executable will not be included when updating. To ensure the MSW executable is included, please re-install SHOTPlus™ Tunnel by downloading the installer from the BlastIQ™ Support website, here.
Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request